Skip to main content
Loading…
This section is included in your selections.

A. Building Height:

Building height allowances shall be the same as permitted in the underlying zoning district.

B. Building Setbacks:

1. Front Yard:

a. Lots 10,800 square feet and under do not have a front yard setback requirement but must meet sight triangle requirements when a corner lot. Must not encroach into platted easements.

b. Lots over 10,800 square feet must provide a 10-foot front yard and must meet sight triangle requirements when a corner lot. Must not encroach into platted easements.

2. Side Yard:

None required, except on corner lots. Street side yards must meet sight triangle requirements. Must not encroach into platted easements.

3. Rear Yard:

None required; must not encroach into platted easements.

C. Maximum Lot Coverage:

1. Lots may have one hundred percent (100%) lot coverage exclusive of any easements or required setbacks. (20-14, Added, 09/15/2020)